X
How do I get paid? Learn about our new Secured Funds Program!
  Ver el sitio en English, Español, o Français
La boletería solidaria
¡Registrarme!  |  Entrar
 
Encontrar un evento Crear tu evento Ayuda
 
ASCE COPRI Seattle - October 16th Dinner Meeting
Ivar's Salmon House
Seattle, WA
Compartir este evento
Obtener entradas
No hay fechas activas para este evento.

Evento

ASCE COPRI Seattle - October 16th Dinner Meeting
The COPRI Seattle Chapter invites you to an October 16 dinner presentation at Ivars Salmon House.  We are pleased to welcome Daryl English from Moffatt & Nichol who will present on a Stiff Leg Mooring System at McMurdo Station, Antarctica.


Climate change has significantly reduced the lifespan of reinforced floating ice piers that McMurdo Station constructs for annual offload and resupply operations. A more robust replacement solution was required to meet the stations long-term needs. A steel barge-like floating dock moored in position with stiff legs, overwintering in Winter Quarters Bay, was the preferred option.  The presentation will outline several key design aspects of the stiff leg mooring system in a cold region including the relationships between important stakeholders.  Special considerations were given to account for the harsh environment, an extremely remote location, limited onsite resources, equipment limitations, potential environmental contamination, and climate change. Two steel orthotropic-deck transfer bridges were designed as access points between the barge and the shore. The stiff-leg mooring system included flexible axial elastomeric elements (load cells) to secure the barge and limit displacements. Precast concrete stiff-leg foundations were designed to be assembled on site by post-tensioning two pieces. Barge forces are transferred to slurried freeze-back piles installed in 70 ft of fast ice.

Speaker:

Daryl English, PE, SE, P.Eng, BC.PE
Senior Project Manager | Structural Engineer, Moffatt & Nichol
Daryl English is a Project Manager and Structural Engineer at Moffatt & Nichol with 31 years of experience in ports, waterfront design, bridge design, rehabilitation design, peer reviews, value engineering, condition inspections, cost estimating, seismic analysis, and seismic retrofitting. In addition to extensive design work on container terminals, cruise terminals, oil terminals, grain terminals and bridge structures, he has performed numerous condition inspections, load ratings, and repair evaluations for marine structures, including timber and concrete wharf facilities, trestles, mooring systems, berthing dolphins, steel docks, and cathodic protection systems.

Ubicación

Ivar's Salmon House (Ver)
401 NE Northlake Way
Seattle, WA 98105
United States

Categorías

Ninguna

Apropiado para niños: No
Se aceptan perros: No
No fumar:
Accesible a silla de ruedas:

Contacto

Organizador: ASCE COPRI Seattle
En BPT desde: Sep 14, 2012
 
Ellis Beckwith
sections.asce.org/seattle/...


Contáctanos
Correo electrónico
support@brownpapertickets.com
Teléfono
1-800-838-3006 (temporalmente no disponible)
Recursos
Desarrolladores de Software
Ayuda
Compradores de entradas
Rastrear un pedido
Navegar por los eventos
Ubicaciones
Organizadores de Eventos
Crear un evento
Precios
Servicios
Entradas pre-impresas
Lista de locales
Entérate sobre eventos locales
Recibe notificaciones por correo electrónico diarias o semanales acerca de eventos nuevos y con descuento en tu localidad
Inscríbete a eventos locales
Conéctate con nosotros
Síguenos en Facebook
Twitter
Síguenos en Instagram
YouTube
Conócenos
El uso de este servicio está sujeto a los Términos de uso, Política de Privacidad, y Política de Cookies de Brown Paper Tickets. Todos los derechos reservados © 2000-2025 Móvil EN ES FR